District news
Shelton plans bids to restore Elizabeth Shelton’s damaged gym floor
What happened
Shelton planned to seek bids for Elizabeth Shelton School’s gym floor after moisture damage left part of the gym blocked off. Officials hoped work could begin during Christmas break, but that timing depended on bidding and was not a confirmed reopening date.
Why it matters to families
The partial gym closure limits space for students, whole-school assemblies and family events while the district works toward a lasting repair.
The evidence
Current October28report20:55–21:23: scope prepared, purchasing to release bid hopefully next week, possible Christmas-break start if all goes well. Trusted September23doc166295offset7200–13700,9:38–13:02: Elizabeth Shelton gym partly blocked by temporary wall; remaining area in use; assemblies/PTAevents affected. Trusted October21doc166292offset12000–24000,12:38–17:21: half-floor buckled/rotted, underlying water/moisture observed; air test found elevated mold in one corner, area scrubbed/primed and isolated with plastic/barricade. Potential underfloor asbestos inferred from old drawings remains unconfirmed and is not a finding. Moisture mitigation and floor material still under study; no award/price or completed abatement inferred. Full prior topic conclusions read. Current record is later bid-process update; history search and claim show no published duplicate.
The source
BOE Regular Meeting 10/28/2026See the full record for Shelton School District.
Get alerts like this for Shelton School District
We read every agenda, packet, and set of minutes, and write up the decisions that affect families — each one linked to the document it came from, the moment it's public.
Get personalized alerts